日韩精品一区二区久久,久久精品国产精品青草,久久青青草原精品亚洲,欧美变态口味重另类在线视频

公告:自動售酒機
白酒運輸罐的充水實驗應(yīng)該注意什么?

發(fā)布于:2021-02-26 15:55:19  來源:http://www.2010yyh.cn

,設(shè)備在充水過程中充水到設(shè)計高液位下1m時進行固定頂部強度及嚴(yán)密性試壓,關(guān)閉透光孔,同時安裝U型壓差計,邊充水增壓,當(dāng)U型計正壓到設(shè)計要求水柱時,用肥皂水檢查罐壁頂每條焊縫,升壓不能超過設(shè)計要求水柱,如不滿且罐頂無異常變形為合格,然后打開透光孔,繼續(xù)充水,到罐體設(shè)計液位,臺罐充水淺驗合格后,連接好第二臺充水管線,將水排放到第二臺儲罐,固定頂?shù)姆€(wěn)定性試驗應(yīng)充水到設(shè)計液壓,用防水方法進行,此時壓差做負壓試驗,一面排水緩慢降壓到設(shè)計要求水柱時,恢復(fù)常壓。
First of all, when the equipment is filled with water to 1m below the designed high liquid level, the fixed top strength and tightness pressure test shall be carried out, the light transmission hole shall be closed, and the U-shaped differential pressure gauge shall be installed at the same time. When the U-shaped differential pressure gauge is pressurized to the design required water column, soapy water shall be used to check each welding seam on the top of the tank wall, and the pressure rise shall not exceed the design required water column. If it is not satisfied and there is no abnormal deformation on the tank top, it is qualified, and then Open the transparent hole and continue to fill water until the designed maximum liquid level of the tank is reached. After the water filling of the first tank is qualified, connect the water filling pipeline of the second tank and discharge the water to the second tank. The stability test of the fixed roof should be filled to the designed maximum hydraulic pressure and carried out by the waterproof method. At this time, the negative pressure test should be carried out for the differential pressure. When one side of the tank drains slowly and depressurizes to the designed water column, the normal pressure should be restored.
其次,每天上下午都要從進氣孔鋼梯下去,檢查浮量升降情況,同時檢查打磨罐壁及飛濺渣,保護好浮盤密封板皮帶,同時打磨出晚上充水高的余量。在充水和排水時進行罐內(nèi)浮盤升降的檢查。停止充水觀察48小時檢查基礎(chǔ)周圍與地平面有沒裂縫及下沉的痕跡,白酒運輸罐從罐頂東西面南北方向放線錘。沖水過程中要檢查罐壁底板是否有漏水的痕跡,如有發(fā)現(xiàn)及時排水處理。
Secondly, every morning and afternoon, we should go down from the steel ladder at the air inlet to check the fluctuation of the floating capacity. At the same time, we should check and polish the tank wall and splashing slag, protect the belt of the sealing plate of the floating plate, and polish the margin of the water filling height at night. During water filling and drainage, check the lifting of floating plate in the tank. Stop filling for 48 hours and check the cracks around the foundation and ground floor. The Baijiu can be used from the top of the tank to the north and south direction of the tank. In the process of flushing, it is necessary to check whether there is any trace of water leakage on the tank wall and bottom plate, and timely drain if any.
不銹鋼內(nèi)膽實木酒桶
,在做實驗的時候,也要注意酒罐在施工時的措施。嚴(yán)禁攜帶香煙及火種進入施工現(xiàn)場。罐吊施工中,指揮的聯(lián)絡(luò)系統(tǒng)必須可靠,牢固,嚴(yán)格控制吊升速度,防止事故發(fā)生。庫內(nèi)施工必須嚴(yán)格遵守相關(guān)防火制度,及時辦理動火批準(zhǔn)手續(xù),在指定的區(qū)域范圍內(nèi)動火,下班前不必須關(guān)掉施工用具電源,熄滅一切火種。
Finally, when doing the experiment, we should also pay attention to the safety measures in the construction of wine tank. It is strictly forbidden to bring cigarettes and kindling into the construction site. During the construction of the tank crane, the command liaison system must be safe, reliable and firm, and the hoisting speed must be strictly controlled to prevent accidents. The construction in the warehouse must strictly abide by the relevant fire prevention system, timely handle the fire approval procedures, carry out the fire in the designated area, and do not have to turn off the power supply of construction tools and extinguish all kinds of fire before work.
加強自身保護,高空作業(yè)前必須檢查一下腳手架搭設(shè)是否可靠,梯子是否有防滑措施,跳板是否會跳頭等關(guān)鍵部位。不銹鋼罐進行正壓試驗時,應(yīng)嚴(yán)密觀察U型壓力計,驗收合格應(yīng)立即使罐體與大氣相通,恢復(fù)正常。各種用電設(shè)備,手持電動工具及罐體必須接地可靠,并裝有漏電保護器,各種電線電纜絕緣良好,而且要經(jīng)常檢查是否有外傷損壞絕緣,及時處理。在施工區(qū)域內(nèi)備足滅火器及有關(guān)的的防火器材,確保施工用火。
Strengthen self-protection. Before working at height, you must check whether the scaffold is safe and reliable, whether the ladder has anti-skid measures, whether the springboard will jump and other key parts. During the positive pressure test of stainless steel tank, the U-type pressure gauge should be closely observed, and the tank body should be connected with the atmosphere immediately after the acceptance. All kinds of electric equipment, hand-held electric tools and tanks must be grounded reliably and equipped with leakage protector. All kinds of wires and cables must be well insulated. Besides, it is necessary to check whether there is any damage to the insulation and deal with it in time. Sufficient fire extinguishers and related fire prevention equipment shall be prepared in the construction area to ensure the construction safety.

咨詢熱線:
0537-4556677

久久99热这里都是精品啊-国产成人亚洲精品无码aV| 女主播啪啪大秀免费观看-精品99午夜福利影院| 五月婷婷免费观看视频-男人操女人下面视频在线免费看| 欧美日韩国产亚洲免费-肉体粗喘娇吟国产91| 日本中文字幕永久在线人妻蜜臀-欧美一区二区的网站在线观看| 日韩二级视频在线观看-美女扒开奶罩露出奶子的视频网站| 亚洲国产中文欧美一区二区三区-国产精品一区二区视频成人| 亚洲欧美日韩国产一区二区三区-国产欧美日韩一区二区免费| 天天日天天干天天综合-99久久综合狠狠综合久久| 一区二区三区日本韩国欧美-日本1区2区3区4区在线观看| 国产精品v欧美精品v日韩精品-国产欧美日韩精品区一区二污污污| 亚洲另类熟女国产精品-懂色一区二区三区在线播放| 精品国产综合一区二区三区-蜜臀一区二区三区刺激视频| 97香蕉久久国产在线观看-麻豆黄色广告免费看片| 亚洲欧美精品在线一区-99热国产在线手机精品99| 免费av一区在线观看-国产精品视频高潮流白浆视频免费| 国产aa视频一区二区三区-国产精品久久久久久久毛片动漫| 亚洲av专区在线观看国产-丰满人妻av一区二区三区| 中文字幕偷拍亚洲九色-亚洲视频不卡一区二区天堂| 少妇人妻无码久久久久久-综合图片亚洲网友自拍| 久久精品国产96精品-日韩人成理论午夜福利| 久久亚州天堂一区二区-色噜噜色哟哟一区二区三区| 三上悠亚免费观看在线-青青草原在线视频观看精品| 欧美日本亚一级二级三区久久精品-日韩欧美一区二区久久婷婷| 午夜福利院免费在线观看-久久精品日产第一区二区三区画质| 国产精品美女在线网址-久草免费福利在线观看视频| 中文字幕精品一区二区日本99-青青国产成人久久91网| 国产成人精品免费视频大全办公室-亚洲欧美日本综合在线| 日韩高清在线观看一区二区-美产av在线免费观看| 交换朋友的妻子中文字幕-日本美女8x8x8x8| 午夜福利院免费在线观看-久久精品日产第一区二区三区画质| 亚洲黑人欧美一区二区三区-亚洲一区二区三区免费视频播放| 日韩精品中文在线观看一区-亚洲bt欧美bt精品| 黄片黄片在线免费观看-激情综合网激情五月俺也去| 日韩国产一区二区三区在线-精品日韩人妻少妇av| 亚洲欧美日韩国产一区二区三区-国产欧美日韩一区二区免费| 欧美日韩国产综合四区-爆操极品尤物熟妇14p| 亚洲产国偷v产偷v自拍性色av-亚洲欧美日韩国产三区| 一级小黄片在线免费看-亚洲欧美午夜情伊人888| 欧美aa一级视频播放-久一一区二区三区大香蕉| 99久热精品免费观看四虎-亚洲天堂精品视频在线|